U.S. Army
U.S. Army's Categorical Exclusions (opens in new tab)Categorical Exclusion
(b) Construction and demolition:
Exclusion Text
(13) Reconstruction, repair, restoration, retrofitting, or replacement of any facility, structure, road, or trail (including fencing, gates, parking lots, erosion control structures, storm water control structures, roads, trails, revegetation, removal of debris, or any other infrastructure improvement), that was in use and operation, or was under construction, and was damaged or destroyed due to a natural event, including but not limited to wildfires, floods, earthquakes, landslides, weather events; or an accident, vandalism, or an act of terrorism; and which will substantially conform to the preexisting design, function, and location as the original (REC required; will include consideration of anticipated temporary construction impacts).
Disclaimer
This CE Explorer tool is not an authoritative source and creates no rights or obligations. When using the CE Explorer Tool, Federal agencies and stakeholders should review the relevant agency's NEPA procedures for information about how to apply the CE, including any limitations or potential extraordinary circumstances, and to ensure that a CE is current and applicable to a given proposed action. For ease of use, a link to each agency's NEPA procedures and CEs is provided along with the text of the CE. To adopt and use another agency's categorical exclusion, an agency must follow the steps described in section 109 of NEPA, 42 U.S.C. 4336c.