Tennessee Valley Authority
Tennessee Valley Authority's Categorical Exclusions (opens in new tab)Categorical Exclusion
Tennessee Valley Authority (TVA)
Exclusion Text
16. Construction of new transmission line infrastructure, including electric transmission lines generally no more than 10 miles in length and that require no more than 125 acres of new developed rights-of-way and no more than 1 mile of new access road construction outside the right-of-way; and/or construction of electric power substations or interconnection facilities, including switching stations, phase or voltage conversions, and support facilities that generally require the physical disturbance of no more than 10 acres.
Disclaimer
This CE Explorer tool is not an authoritative source and creates no rights or obligations. When using the CE Explorer Tool, Federal agencies and stakeholders should review the relevant agency's NEPA procedures for information about how to apply the CE, including any limitations or potential extraordinary circumstances, and to ensure that a CE is current and applicable to a given proposed action. For ease of use, a link to each agency's NEPA procedures and CEs is provided along with the text of the CE. To adopt and use another agency's categorical exclusion, an agency must follow the steps described in section 109 of NEPA, 42 U.S.C. 4336c.