Maritime Administration
Maritime Administration's Categorical Exclusions (opens in new tab)Categorical Exclusion
Maritime Administration (MARAD)
Exclusion Text
(9) Demolition and removal of buildings and other structures; water, sewage, electrical, gas, or other utility extensions of temporary duration; new gardening or landscaping, or the maintenance of existing landscape; filling of earth into previously excavated land with material compatible with the natural features of the site; minor trenching and backfilling where the surface is restored and excavated material is protected against wash and runoffs; grading on land with a slope of less than 10 percent; removal of obstructions on Maritime Administration property; and erosion control actions with no off-Maritime Administration property impact.
Disclaimer
This CE Explorer tool is not an authoritative source and creates no rights or obligations. When using the CE Explorer Tool, Federal agencies and stakeholders should review the relevant agency's NEPA procedures for information about how to apply the CE, including any limitations or potential extraordinary circumstances, and to ensure that a CE is current and applicable to a given proposed action. For ease of use, a link to each agency's NEPA procedures and CEs is provided along with the text of the CE. To adopt and use another agency's categorical exclusion, an agency must follow the steps described in section 109 of NEPA, 42 U.S.C. 4336c.