16. Construction of new transmission line infrastructure, including electric transmission lines generally no more than 10 miles in length and that require no more than 125 acres of new developed rights-of-way and no more than 1 mile of new access road construction outside the right-of-way; and/or construction of electric power substations or interconnection facilities, including switching stations, phase or voltage conversions, and support facilities that generally require the physical disturbance of no more than 10 acres.
Provenance
- Agency: Legacy CEQ-compiled dataset (pre-authoritative baseline) (LEGACY)
- Source provenance: Compiled reference
- Source type: legacy seed
- Identifier:
TVA---1-15 - Fetched at: 1970-01-01T00:00:00+00:00 (not an agency verification date)
Source legal reference
CEQ-compiled compendium of Federal categorical exclusions (historical, non-authoritative baseline)
Disclaimer
This CE Explorer tool is not an authoritative source and creates no rights or obligations. Review the relevant agency's NEPA procedures before applying a categorical exclusion.
When using the CE Explorer Tool, Federal agencies and stakeholders should review the relevant agency's NEPA procedures for information about how to apply the CE, including any limitations or potential extraordinary circumstances, and to ensure that a CE is current and applicable to a given proposed action. To adopt and use another agency's categorical exclusion, an agency must follow the steps described in section 109 of NEPA, 42 U.S.C. 4336c.