Legacy CEQ-compiled dataset (pre-authoritative baseline)
Compiled referenceCategorical Exclusion
Construction, Installation, and Demolition Activities
*Denotes classes of actions that have a higher possibility of involving extraordinary circumstances. A REC will be prepared to document consideration of extraordinary circumstances whenever a CATEX that is identified by an asterisk is used.
Exclusion Text
E1 Construction, installation, operation, maintenance, and removal of utility and communication systems (such as mobile antennas, data processing cable, and similar electronic equipment) that use existing rights-of-way, easements, utility distribution systems, and/or facilities. This is limited to activities with towers where the resulting total height does not exceed 200 feet and where the FCC would not require an EA or EIS for the acquisition, installation, operation or maintenance.
Provenance
- Agency: Legacy CEQ-compiled dataset (pre-authoritative baseline) (LEGACY)
- Source provenance: Compiled reference
- Source type: legacy seed
- Identifier:
DHS--1-5-36 - Fetched at: 1970-01-01T00:00:00+00:00 (not an agency verification date)
Source legal reference
CEQ-compiled compendium of Federal categorical exclusions (historical, non-authoritative baseline)
Disclaimer
This CE Explorer tool is not an authoritative source and creates no rights or obligations. Review the relevant agency's NEPA procedures before applying a categorical exclusion.
When using the CE Explorer Tool, Federal agencies and stakeholders should review the relevant agency's NEPA procedures for information about how to apply the CE, including any limitations or potential extraordinary circumstances, and to ensure that a CE is current and applicable to a given proposed action. To adopt and use another agency's categorical exclusion, an agency must follow the steps described in section 109 of NEPA, 42 U.S.C. 4336c.