Federal Bureau of Investigation
Federal Bureau of Investigation's Categorical Exclusions (opens in new tab)Categorical Exclusion
(d) List of REC Determination Form Required (R) FBI CATEXs.
Exclusion Text
(R4) New construction (e.g., facilities, roads, parking areas, trails, solar panels, and wind turbines) or improvement of land where all of the following conditions are met: (i) The site is in a developed or a previously disturbed area; (ii) The proposed use will not substantially increase the number of motor vehicles at the facility or in the area; (iii) The construction or improvement will not result in exceeding the infrastructure capacity outside of FBI-managed property (e.g., roads, sewer, water, and parking); (iv) The site and scale of construction or improvement are consistent with those of existing, adjacent, or nearby buildings; and (v) The structure and proposed use are compatible with applicable Federal, tribal, state, and local planning and zoning standards and consistent with federally approved state coastal management programs.
Disclaimer
This CE Explorer tool is not an authoritative source and creates no rights or obligations. When using the CE Explorer Tool, Federal agencies and stakeholders should review the relevant agency's NEPA procedures for information about how to apply the CE, including any limitations or potential extraordinary circumstances, and to ensure that a CE is current and applicable to a given proposed action. For ease of use, a link to each agency's NEPA procedures and CEs is provided along with the text of the CE. To adopt and use another agency's categorical exclusion, an agency must follow the steps described in section 109 of NEPA, 42 U.S.C. 4336c.