Categorical Exclusion (CE)

Department of Agriculture

Department of Agriculture's Categorical Exclusions (opens in new tab)

Categorical Exclusion

U.S. Department of Agriculture (USDA)

Exclusion Text

(USDA-18c-RD) Financial assistance for minor construction proposals. The CEs in this section are for proposals for financial assistance that involve no or minimal alterations in the physical environment and typically occur on previously disturbed land. These actions normally do not require an applicant to submit environmental documentation with the application. However, based on the review of the project description, the Agency may request additional environmental documentation from the applicant at any time, specifically if the Agency determines that extraordinary circumstances may exist. In accordance with section 106 of the National Historic Preservation Act (54 U.S.C. 300101-306108) and its implementing regulations under 36 CFR 800.3(a), the agency has determined that the actions in this section are undertakings, and in accordance with 36 CFR 800.3(a)(1) has identified those undertakings for which no further review under 36 CFR part 800 is required because they have no potential to cause effects to historic properties. In accordance with section 7 of the Endangered Species Act (16 U.S.C. 1531-1544) and its implementing regulations at 50 CFR part 402, the agency has determined that the actions in this section are actions for purposes of the Endangered Species Act, and in accordance with 50 CFR 402.06 has identified those actions for which no further review under 50 CFR part 402 is required because they will have no effect to listed threatened and endangered species. (i) Minor amendments or revisions to previously approved projects provided such activities do not alter the purpose, operation, geographic scope, or design of the project as originally approved; (ii) Repair, upgrade, or replacement of equipment in existing structures for such purposes as improving habitability, energy efficiency (including heat rate efficiency), replacement or conversion to enable use of renewable fuels, pollution prevention, or pollution control; (iii) Any internal modification or minimal external modification, restoration, renovation, maintenance, and replacement in-kind to an existing facility or structure; (iv) Construction of or substantial improvement to a single-family dwelling, or a Rural Housing Site Loan project or multi-family housing project serving up to four families and affecting less than 10 acres of land; (v) Siting, construction, and operation of new or additional water supply wells for residential, farm, or livestock use; (vi) Replacement of existing water and sewer lines within the existing right-of-way and as long as the size of pipe is either no larger than the inner diameter of the existing pipe or is an increased diameter as required by Federal or state requirements. If a larger pipe size is required, applicants must provide a copy of written administrative requirements mandating a minimum pipe diameter from the regulatory agency with jurisdiction; (vii) Modifications of an existing water supply well to restore production in existing commercial well fields, if there would be no drawdown other than in the immediate vicinity of the pumping well, no resulting long-term decline of the water table, and no degradation of the aquifer from the replacement well; (viii) Burying new facilities for communication purposes in previously developed, existing rights-of-way and in areas already in or committed to urbanized development or rural settlements whether incorporated or unincorporated that are characterized by high human densities and within contiguous, highly disturbed environments with human-built features. Covered actions include associated vaults and pulling and tensioning sites outside rights-of-way in nearby previously disturbed or developed land; (ix) Changes to electric transmission lines that involve pole replacement or structural components only where either the same or substantially equivalent support structures at the approximate existing support structure locations are used; (x) Phase or voltage conversions, reconductoring, upgrading, or rebuilding of existing electric distribution lines that would not affect the environment beyond the previously developed, existing rights-of-way. Includes pole replacements but does not include overhead-to-underground conversions; (xi) Collocation of telecommunications equipment on existing infrastructure and deployment of distributed antenna systems and small cell networks provided the latter technologies are not attached to and will not cause adverse effects to historic properties; (xii) Siting, construction, and operation of small, ground source heat pump systems that would be located on previously developed land; (xiii) Siting, construction, and operation of small solar electric projects or solar thermal projects to be installed on or adjacent to an existing structure and that would not affect the environment beyond the previously developed facility area and are not attached to and will not cause adverse effects to historic properties; (xiv) Siting, construction, and operation of small biomass projects, such as animal waste anaerobic digesters or gasifiers, that would use feedstock produced on site (such as a farm where the site has been previously disturbed) and supply gas or electricity for the site's own energy needs with no or only incidental export of energy; (xv) Construction of small standby electric generating facilities with a rating of one average megawatt (MW) or less, and associated facilities, for the purpose of providing emergency power for or startup of an existing facility; (xvi) Additions or modifications to electric transmission facilities that would not affect the environment beyond the previously developed facility area including, but not limited to, switchyard rock, grounding upgrades, secondary containment projects, paving projects, seismic upgrading, tower modifications, changing insulators, and replacement of poles, circuit breakers, conductors, transformers, and crossarms; and (xvii) Safety, environmental, or energy efficiency (including heat rate efficiency) improvements within an existing electric generation facility, including addition, replacement, or upgrade of facility components (such as precipitator, baghouse, or scrubber installations), that do not result in a change to the design capacity or function of the facility and do not result in an increase in pollutant emissions, effluent discharges, or waste products.

Disclaimer

This CE Explorer tool is not an authoritative source and creates no rights or obligations. When using the CE Explorer Tool, Federal agencies and stakeholders should review the relevant agency's NEPA procedures for information about how to apply the CE, including any limitations or potential extraordinary circumstances, and to ensure that a CE is current and applicable to a given proposed action. For ease of use, a link to each agency's NEPA procedures and CEs is provided along with the text of the CE. To adopt and use another agency's categorical exclusion, an agency must follow the steps described in section 109 of NEPA, 42 U.S.C. 4336c.

permitting.innovation.gov

An official website of the General Services Administration

Looking for U.S. government information and services?
Visit USA.gov